Bongshai Housing
Packages ৳3,75,000–৳96,00,000
Build time 45–60 days
Frame Grade 50 steel, BNBC 2020
Models 133
Since 2008

Popular models

কিছু জানার আছে? উত্তর সাথে সাথে, ফোন করার আগেই
  • যেকোনো মডেলের প্যাকেজ দাম
  • সাইজ, রুম লেআউট, কত তলা
  • কত দিনে তৈরি, কী কী থাকবে

উত্তর না পেলে আমাদের টিম সরাসরি ধরবে।

অথবা ফোন করুন

Estimate your cost

An indicative range for a size we have not built yet. Every model above has a fixed package price.

Estimated package range

An indicative range from published model rates, not a quotation. Final cost depends on site conditions, finish level and structural design.

Delivered projects

Bodorgonj, Rangpur
Completed Project
Chattogram
Completed Project
Kaliganj, Dhaka
Completed Project
Daudkandi, Cumilla
Completed Project

Why Bongshai

up to 3×
faster than traditional brick-and-concrete construction
Grade 50
high-tensile structural steel, engineered to BNBC 2020 seismic
2008
building across Bangladesh since
45–60
days to a completed earthquake-resistant home
No hidden costs
Every fixed package price covers structure and finishing, foundation and civil work, and electrical and plumbing. VAT and delivery outside the main cities are written on your quotation before you sign.

How it works

  1. 01
    What happens during Consultation?

    Tell us your requirements, budget, and vision. Our expert advisors guide you through the best housing package.

  2. 02
    How do we handle Design & Planning?

    Our architects create custom blueprints aligned with your needs, local regulations, and structural excellence.

  3. 03
    What is our Construction phase?

    Expert engineers and skilled workers build your home using premium materials with full quality control oversight.

  4. 04
    How does the Handover process work?

    We deliver your completed home on schedule, conduct final inspections, and provide after-sales support.

What clients say

★★★★★
Bongshai Housing delivered our industrial shed in Gazipur ahead of schedule. The quality of the steel structure is phenomenal and the team was highly professional.
Mahmudul HasanFactory Owner, Gazipur
★★★★★
We built our eco-friendly resort using their prefab modular units. The finish is indistinguishable from concrete, but it was built in half the time!
Anwar SadatResort Developer, Cox's Bazar
★★★★★
From the first 3D mockup to the final handover, the process was seamless. Our two-story steel-framed house looks absolutely gorgeous.
Farhana RahmanHomeowner, Dhaka